Construction Programming and Cost Control – A Case Study of a leading Irish contractor

Doherty, Brian (2010) Construction Programming and Cost Control – A Case Study of a leading Irish contractor. Masters thesis, Waterford Institution of Technology.

[thumbnail of Brian_Doherty.pdf]
Preview
PDF
Brian_Doherty.pdf

Download (716kB) | Preview
Item Type: Thesis (Masters)
Departments or Groups:
Divisions: School of Engineering > Department of Construction and Civil Engineering
Depositing User: Bryan Hallissey
Date Deposited: 09 Nov 2010 21:26
Last Modified: 22 Aug 2016 10:26
URI: http://repository-testing.wit.ie/id/eprint/1589

Actions (login required)

View Item View Item